📋 Tender Overview
Back 06/03/2026 Podleze-Piekielko: A modern railway will connect Krakow with Gdow. By 2030, we will build a new railway line from Krakow to Gdow. The investment, worth almost PLN 3.2 billion gross, will include the construction of modern stations and stops, tracks, bridges, viaducts and an over 900-meter tunnel. Residents of Gdow and surrounding towns will gain a fast and reliable connection to Krakow. Thus, we will complete the next stage of the largest investment of Polskie Linie Kolejowe S.A. in the country, which will improve communication in Malopolska, shorten journeys to Zakopane and Nowy Sacz, and also facilitate the international transport of goods. Contractors will have exactly 46 months to build a new, double-track railway line with a length of approximately 20 kilometers. We have signed an agreement with a consortium of Budimex S.A., Budimex Kolejnictwo S.A., and Ferrovial Construction (UK) Limited for the construction of the part of the Podleze-Piekielko investment located closest to Krakow. The tracks to Gdow will ensure efficient passage of passenger and freight trains. Travel time to the center of Krakow will be approximately 30 minutes. In addition to the station in Gdow, we will also build a new station Podleze Balachowka and stops in Zagorze near Niepolomice and Wiatowice. The platforms will be fully adapted to the needs of people with limited mobility thanks to underground passages and collision-free intersections equipped with elevators. - Today we signed a contract for the Podleze - Gdow line worth PLN 3 billion. I would like to thank the residents of Gdow for their perseverance in protecting the corridor for investments. Thanks to your responsibility, we are building without demolitions and unnecessary conflicts - says Wladyslaw Kosiniak-Kamysz, Vice-President of the Council of Ministers, Minister of National Defense. - The Podleze-Piekielko project is an investment that is of great importance for the development of the entire region. Its not just about building railway tracks. It is a development impulse for the entire Malopolska region - for local communities, economy, tourism and mobility of residents. The contract signed today concerns the construction of a new section of the railway line between Podleze and Gdow. This is an investment worth over PLN 3 billion - says Dariusz Klimczak, Minister of Infrastructure. - The Podleze-Piekielko railway line is an investment that is important not only for Malopolska. It will also improve transport between Poland and Slovakia, creating new opportunities for the entire region. We have been waiting for such projects for years - now we are catching up in infrastructure and taking a step towards the railway, which will become a truly convenient and unrivaled means of travel in the south of the country - said Piotr Malepszak, Undersecretary of State at the Ministry of Infrastructure. - We are continuing a key railway investment for Malopolska and the entire country. Thanks to it, we will improve the quality of life of the inhabitants of this region. I am glad that our efforts will contribute to the social, economic and tourist development of many towns - says Piotr Wyborski, President of the Management Board of PKP Polskie Linie Kolejowe S.A. The railway line under construction has been designed so that all road intersections are two-level, which will have a positive impact on the safety and reliability of railway traffic. The new section will seamlessly join the existing E30 railway line (Krakow - Rzeszow) between the Wegrzce Wielkie stop and the Podleze station. The system of flyovers and engineering structures will run new tracks over the A4 motorway and connect them with the railway line towards Krakow Glowny and Nowa Huta. From Podleze to the south, the tracks will be routed using numerous bridges and viaducts. The investment will also include the construction of a two-bay railway tunnel with a length of over 900 meters. The final element of this part of the Podleze-Piekielko project will be a railway station in Gdow, which will be built in the vicinity of Marszowice. The platforms will be located under the existing road. For the purposes of the investment, it will be raised and connected to the station. The first trains will arrive from Krakow to Gdow in 2030. A total of 42 different engineering structures will be built on this section, including bridges and railway viaducts. The longest will reach over 1,300 meters. 33 collision-free crossings were designed for the safety of rail and road traffic. The construction of the Podleze - Podleze Balachowka and Podleze - Gdow railway lines is part of the Podleze-Piekielko project, the largest investment of PLK SA. Currently, construction works are underway on five fragments of this investment (Rabka Zaryte - Fornale, Szczyrzyc - Tymbark, Limanowa station, Limanowa - Kleczany siding, Kleczany - Nowy Sacz siding). From December 2025, travelers can use the first section put into operation (Chabowka - Rabka Zaryte). This year, trains will also appear on the Nowy Sacz - Marcinkowice section. A tender procedure is underway for the modernization of the railway line from Tymbark to Limanowa. The investment consists of the modernization and electrification of 75 km of the Chabowka - Nowy Sacz route and the construction of a 58 km new line, ultimately connecting Podleze with Tymbark and Mszana Dolna. This will create a new connection thatwill facilitate communication between Krakow and Podhale and the Sadecczyzna region. The fastest trains will run on the Krakow - Nowy Sacz route in approximately 60 minutes. The journey from the capital of Malopolska to Zakopane will take approximately 90 minutes. Portions of this investment are financed under the National Recovery and Resilience Plan. More about the project: www.podleze-piekielko.pl