📋 Tender Overview
The Ministry of Transportation and Communications (MTC), through Nacional Provias, performs repair work in the Sullana bridge, located between kilometers 2+030 and 2+320 of the Sullana - Mancora road, in the Sullana sector, department of Piura.
The work consists in the cleaning and removal of deteriorated areas, formwork, reinforcement with steel and replacement with concrete, with the aim of recovering and reinforcing the affected areas of the bridge. For this reason, the restriction of traffic to a single lane has been arranged 24 hours a day, for all types of vehicles, both light and heavy load.
The work began on April 30 with traffic signaling and control activities, and will continue with corrective and preventive interventions until May 7. During this period, drivers are recommended to take the necessary precautions, respect the speed limits and address the safety signaling installed in the area.
These actions are part of the programmed maintenance of the Sullana bridge, necessary to preserve vehicular flow and guarantee safety and transitability in this important communication route.
Nacional Provias reaffirms its commitment to maintain in optimal conditions the national roads and urges users to collaborate with the personnel in charge of traffic control during the development of the works.
Lima, April 30, 2025