📋 Tender Overview
After more than three decades of waiting, the neighbors of Pin Pon (high and bass), in the San Jacinto town center, are protagonists of a historical change. With an advance of 40%, the new paths are already appreciated, while the main matrix of drinking water has been recovering with the installation of home connections.
In parallel, sub -base conformation work and pavement base with heavy machinery are carried out, to subsequently print and place the hot asphalt. The concrete ponto that unites Santa Rosa with Pin Pon is already a reality, while the pontoon that will link Pin put with Pin Pon high, and the ponto of the main income, remain in execution.
In addition, the construction of the containment wall was culminated along the water channel, at the height of the ex -gut, protecting the houses and reinforcing the road infrastructure against possible aniegos. Many neighbors have joined the work through temporary work.
This emblematic work is the result of the participatory budget and, of the commitment of the management led by Mayor Manuel Figueroa Laos, who prioritizes projects that improve the quality of life of the population.