📋 Tender Overview
The Thessaloniki Metro and six main bus lines will be put into pilot 24-hour operation on Saturday 20 and Saturday 27 December, with the aim of expanding the options of safe and reliable transportation in the city, on holidays, throughout the 24 hours.
The bus lines of the pilot action
The lines included in the pilot 24-hour operation are:
6
14
27
32
58
66
The itineraries of the above lines will run approximately every 30 minutes from midnight to 05:00, while in the rest of the hours they will follow the normal frequency of daily routes.
Geographic coverage
The business plan of the two 24 hours includes:
Thessaloniki Metro in full operation
Lines to:
Calamari (6)
Upper Tumba (14)
Stavroupoli - Polichni (27)
Vineyards - Evosmo (32)
Pylaia - Panorama (58)
Heat (66)
Airport (N1)
In this way, a large part of the urban fabric that is not directly served by the Metro is covered, enhancing the connectivity and functionality of the network during the night hours.
The pilot application of the measure will be evaluated at a later stage, based on operational and quality data, in order to examine the possibility of its further utilization, based on the experience already gained from the establishment of permanent 24-hour operation on Saturdays in Athens.
Deputy Minister of Infrastructure & Transport Konstantinos Kyranakis said:
On the 20th and 27th of December, we are putting into practice what we had promised, we are piloting a measure in Thessaloniki that has already proven its value in Athens: the 24-hour operation of the Metro on Saturdays. During the holidays, when the city is in full swing and transportation needs increase, we give citizens a safe and reliable 24-hour transportation option.
The experience from Athens has shown us that the 24-hour operation of transport is not just a convenience, it is a measure that actually contributes to the protection of human life, reducing traffic accidents during the night hours of Saturday, which are also the most dangerous.
The application in Thessaloniki is being implemented in the first phase as a pilot, with our clear intention that it will be evaluated and, with the completion of the extension of the Metro to Kalamaria, that its permanence will be considered.
I want to sincerely thank the public transport workers of Thessaloniki who put their backs behind to make this a reality. Their offer is permanent and was proven in practice during the recent period of interruption of the Metro operation, when the employees of the OASTH ensured that the city continued to move, with many, safe and reliable routes, without inconvenience to the citizens.