📋 Tender Overview
The sanitary sewer and storm drainage works that will transform the urban infrastructure of Pilar advance with specific works in the section that unites the communities of Yataity and Paso Mendez, where the asphalt paving of 3.2 kilometers is expected. Currently, soil movement work is carried out as part of the preparatory tasks for the paving of the journey that connects both locations. The objective is to improve connectivity between communities and university, strengthening the road infrastructure of the area. In parallel, the installation of simple, double and triple cell sewers of 1 m x 1 m, which totals 15 lines of this fundamental infrastructure for water drainage, in order to prevent accumulations and floods is executed. Coastal defense Phase A, completed last December, consisted of the construction of a 9 -kilometer defense wall, which protects some 33,000 people from the floods of the Paraguay River and nearby streams. This structure, complemented with drainage systems, made Pilar a safer city against floods. On the other hand, the works of phase B contemplate macrodrenage and microdrenage interventions. Macrodrejes correspond to large channels that evacuate water at the urban level and are the responsibility of the central government. Microdrejes, on the other hand, cover smaller systems such as gutters, records and sinks in the neighborhoods, whose execution will be in charge of the Municipality. In this way, each institution meets a key role in the prevention of floods and the improvement of the quality of life of the Pilar Families. The works of this phase were awarded by the Ministry of Public Works and Communications (MOPC) to the Neembucu Sanitary Consortium, composed of LT S.A., Constructora Heisecke S.A. and BENITO ROGGIO E HIJOS S.A., BAJO AGUEZA DE CIALPA S.A. and MOPC supervision. Date: August 19, 2025