📄 Tender ID: 461454262 📅 Published: 06 Apr 2021

📋 Tender Overview

The Department of Public Works and Highways DPWH is focusing not only on civil works progress of Estrella-Pantaleon Bridge Project but also on maintaining healthy and safe workplace operation.DPWH Secretary Mark A. Villar said that at 86 percent and with just a few more days to fully complete the new Estrella-Pantaleon Bridge we are mindful that a single case of COVID-19 in the project can lead to an interruption if not total work stoppageSecretary Villar has recently issued a revised guidelines contained in Department Order 30 for the implementation of infrastructure allowed projects both public and private during the public health crisis under ECQ MECQ GCQ and MGCQ. Although the bridge project is being rushed for completion in June 2021 it is critical that construction firms be proactive rather than reactive in dealing with the increased risk of illness from COVID-19 Secretary Villar added. Undersecretary for Unified Project Management Office UPMO Operations Emil K. Sadain together with UPMO Roads Management Cluster 1 Project Manager Benjamin Bautista checked on Monday April 5 2021 the physical progress of the bridge project and compliance of contractor to protocols that covers prevention detection and rapid response to maintain construction work continuity as workers who have been livingconfined in the on-site or off-site barracks resume work after the Lenten break.Lets get to work healthy to get the job done Undersecretary Sadain reminded the contractor China Road and Bridge Corporation citing the current health situation particularly in the NCR Plus bubble. In his report to Secretary Villar Undersecretary Sadain said that project progress of 86 percent is more than 12 percent ahead having completed all bridge substructure works for abutments A B at both sides and piers of Makati approach bridge the V-shaped piers for the Main Bridge concrete box girder for the approach bridge 20 segments of prestressed concrete box girder for the main bridge using form traveler system and two 2 segments of prestressed concrete box girder using conventional method. Bridge construction activities are now on post-tensioning and grouting works formworks and rebar installation for the closure section in the side spans formworks installation for the 2-meter closure section in the main bridge span and preparatory works for approach road construction in both sides. A China-grant project implemented by the DPWH UPMO - Roads Management Cluster 1 Bilateral the new 506-linear meter bridge will have 21.65 meters width capable four 4 lanes from previously two 2 along with 3-meter sidewalks on both sides.Targetted for completion by this second quarter of 2021 the P1.46 Billion new Estrella-Pantaleon Bridge can accommodate 50000 vehicles daily and cut travel time between cities of Mandaluyong and Makati to 12 minutes.The bridge would connect Estrella Street at Makati side to Barangka Drive at Mandaluyong side and help decongest EDSA of traffic as it can serve as an alternate route for motorists. DPWH

🔍 Key Information

📄
Tender Reference No.
461454262
📅
Publication Date
06 Apr 2021
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Philippines

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 06 Apr 2021
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Philippines
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…