📋 Tender Overview
The PET has been carrying out technical and strategic actions that guarantee the supply of water during the 2026 summer season for the benefit of the sectors of Boca del Rio, Vila vila, Llostay.With the aim of ensuring the timely and continuous supply of water resources for the local population and the thousands of visitors who come to the Tacna coast, specialists from the Tacna Special Project (PET) have been carrying out technical and strategic actions that guarantee the supply of water during the 2026 summer season, for the benefit of the sectors of Boca del Rio, Vila Vila and Llostay.
Thanks to the permanent maintenance of the electric pump equipment located in wells No. 135 and No. 496, as well as the pumping system of station No. 207 located on the El Chasqui curve and managed by the PET; The entity has currently begun to operate at 100% of its capacity (24 hours a day, seven days a week). This action allows us to ensure the amount of water for the population of the sector and for the thousands of vacationers who already visit the coastal beaches during the high season.
In this regard, the specialist of the water resource supply goal for Boca del Rio reported that in the year 2024, the current management of the regional governor of Tacna managed to acquire a pumping equipment (American model of the Franklin Electric brand) to reinforce station 207. This equipment has made it possible to deliver a flow of 57 liters per second to the town center of Boca del Rio to date, which has a reservoir with a storage capacity of 2 000 m3, this municipality being in charge of the water purification process and distribution to the residents of the sector.
Likewise, the specialist pointed out that the PET has also been preparing the technical file for the acquisition of two new electric pumps in 2026, which will strengthen the extraction capacity of wells 135 and 496, which currently operate with flow rates of 11 and 16 l/s, respectively.
It is important to highlight that both pieces of equipment already have more than 10 years of use and that through the preventive maintenance carried out by PET the useful life has been extended, in addition to that through an evaluation of the specialty we have concluded that it is necessary to renew the equipment that includes the panel, motor and pump to continue guaranteeing the water resource in the future. ended.
In this way, the Regional Government of Tacna, through the Tacna Special Project, reaffirms its commitment to work in a planned and preventive manner to ensure access to water for the population, strengthening the quality of life and promoting adequate development of tourist and economic activity on the Tacna coast.