📋 Tender Overview
In order to promote better transportation and safe access for more than 2000 residents and farmers of the San Miguel del Ro Mayo town center in the Tabalosos district of the province of Lamas the regional governor Pedro Bogarn Vargas handed over the works to improve the pedestrian bridge one of the routes of entry to this eminently agricultural producing locality. During the protocol ceremony Governor Pedro Bogarn recalled that the bridge had been declared an emergency by Civil Defense due to the constant rainfall that occurs in the area and that for this reason it was decided to make this investment of about 323 thousand soles for build an adequate road infrastructure that allows a greater volume of cargo transported reduction of time and costs of transport constant pedestrian flow and quick access to basic services of the beneficiary localities. Likewise the regional authority highlighted the high agricultural production of the area whose valley is bathed by the waters of the Mayo River . This refurbishment and maintenance safely allows residents and visitors to move from one shore to another while to facilitate the mobilization of their products through vehicles to the consumer markets of Tarapoto and Moyobamba Right now we have new machinery from the regional government which has been intervening in the improvement of the main road that reaches the production centers along 12 kilometers he specified. For her part the mayor of the town Alicia Delgado Cachique thanked the regional governor on behalf of the inhabitants of San Miguel del Ro Mayo highlighting that after a long time the repair of the bridge was carried out which had become a real danger In the same way she specified that after many years the improvement of the main highway in the area has been carried out with machinery from the regional government. Regarding the work carried out disassembly and assembly were carried out for the maintenance of the 6 main steel cables that support the base of the bridge change of joists and wooden stringers along 109.70 meters in a width of 2 meters The railings were also renewed at a height of 1 meter fixed with bolts and nails which are suspended from the cables by means of hangers and metal accessories.