📋 Tender Overview
The technical team of the Infrastructure Management made a visit to verify the restart work of the project Reconstruction of the Zapotal bridge over the Huancabamba River in the Zapotal hamlet District of Huarmaca - Huancabamba Province which was suspended due to the rains registered in the jurisdiction with an advance of 4.This project has an investment of S 5 325355.57. In the visit it was found that it has been restarted with the work concerning the excavation for its next improvement with its own material subsequent emptying of sub footings. In the same way it was verified that the inhabitants of the area are being benefited with labor.