📋 Tender Overview
To ensure the quality of the work Joel Primo Isidro Deputy Manager of Works and Supervision made an unexpected supervision of the remodeling of the Paucarbamba Sports Complex. This work is carried out with an investment of more than 4 million soles.In the area known as La Bombonera where the sports slabs for the practice of volleyball and basketball are built the construction of the porches for the installation of the metal structure that will cover this space was completed. In the coming days polypropylene will be installed on the slab and the bathrooms will be built.In the space that was considered for the parking area a modern recreation area is built which will have eight concrete benches with their respective pergolas and the finishes will be with graniplast coating made with acrylic resins and marble grain.Also in the vicinity of the entrance door located on Micaela Bastidas Avenue a surveillance booth is built where a monitoring center of video surveillance cameras will be installed throughout the sports venue. The equipment to be installed has the capacity of facial recognition. Toilets will also be installed in this area.The inspection also found significant progress in the repainting of the stands of the stadium with the colors required by the Peruvian Institute of Sport as well as in the painting and equipment of the dressing rooms. Progress is according to the execution schedule. In the stadium the luminaires will also be changed because it does not respond to the demands said Primo.