The factory declaration is the registration of a building in the Real Estate Property Registry of Sunarp. ??By registering it, the owner obtains legal recognition of what has been built. After building one or more floors on your property, you can make the factory declaration and if over time you build another floor, you can request an extension of the factory declaration (as long as it complies with the urban and building parameters for your sector).
What is the purpose of the factory declaration?
It serves to recognize your building under legal terms. The factory declaration gives value to your property for the construction you carried out. If your property has extensions and/or remodeling, this will allow the value of the property to increase and said constructions must be registered in the Public Registry so that you can have a document that proves it.
To register the factory or construction that you own in the Public Registry, you must carry out the sanitation of the land or property, by means of purchase sale, donation, inheritance, award or acquisitive prescription (this is done to request the title of property by notary or judicial means for the time that you have been in possession of the property) so that your property rights are registered in the Public Registry.
When registering the land or property, you can make the factory declaration (construction carried out on the property). If you built one or more floors of your house or made the factory declaration of your two floors and after a few years you build two more floors, you must request the expansion of the factory, to increase the value of your property, since this way you demonstrate with a legal document the construction carried out.
Finally, once the factory declaration of your property has been made, you can make the apartments you built independent (in this way each apartment becomes an independent real estate unit with its title of ownership registered in the Public Registry) and thus the owner becomes the owner of several real estate units and can use them to sell, mortgage, inherit, etc.
In which cases can I request a factory declaration?
New construction: When a building is built on a piece of land, that is, the building is completed.
Construction extension: When you build a new floor.
Remodeling: Construction that modifies the original structure of an existing building.
Benefits of registration
When a factory declaration is made, that construction is recognized under legal terms, obtaining benefits such as:
The value of the property increases.
It provides the real cost of the building and facilitates its sale.
The asset can be offered as collateral for a bank loan.
The property may be advanced or given as inheritance.
It can be made independent, that is, the property can be divided into real estate units, facilitating its sale, mortgage, or inheritance in one or several units.
Requirements for registration
To register the factory declaration with Sunarp, you can do so via regularization through Law No. 27157, modified by Law 30830, which applies to constructions completed until December 31, 2016, and the following requirements must be met:
Application for title registration (free distribution form) duly completed and signed by the presenter (person who carries out the procedure at Sunarp).
Property registration form (FOR) approved by Sunarp (available free of charge at the following link https://www.gob.pe/institucion/sunarp/informes-publicaciones/3996832-formularios-registrales-para-la-inscripcion-de-propiedad-yo-regularizacion-de-edificaciones ), which must be signed by the owners and the responsible verifier (civil engineer or chartered architect registered in the Property Verifiers index of the corresponding registry area to carry out the verification of the building) with signatures certified before a notary.
It is worth mentioning that the verifier is in charge of verifying the building for its regularization. The list of authorized verifiers can be found at the following link https://www.sunarp.gob.pe/ConsultaVerificadores/ConsultaVerificadores
In the event that the factory is built by the married couple on land that is the personal property of one of the spouses, a certified copy of the marriage certificate must be attached.
Location, localization and distribution plan, signed by the responsible verifier, whose signature must be certified before a notary.
Technical Verification Report signed by the responsible verifier whose signature must be certified before a notary.
Affidavit with notarized signature of the responsible verifier indicating that it is not included within the assumptions of inadmissibility established in the First Complementary and Final Provision of Law 30830, which specifies that the regularization procedure cannot be applied to buildings erected in archaeological zones, ecological protection zones, zones of risk to health and physical integrity, riverbanks, lakes or seas, as well as in buildings in which the violation of the basic elements of security is evident, which puts human life at risk.
Payment of the registration fee (qualification fee plus registration):
For qualification right (fixed rate): S/ 49.90 soles.
For registration fee (variable rate): 3 multiplied by the value of the construction and then divided by 1000.