📋 Tender Overview
The Ministry of Transport and Communications, through Provías Nacional, completed the installation of the metal structure bridge that is located over the Limón ravine, at kilometer 110 of the Corral Quemado – Lonya Grande – Camporedondo route, Utcubamba province.
This new bridge, 18.29 meters long, was installed with the aim of maintaining the conditions of passability on the road throughout the year, thus overcoming the interruptions in the road that had before the arrival of the rainy season and the activation of the ravine, reinforcing the integration of towns in Yungasuyo. Camporedondo, Lonya Grande, Ocalli, Cohechan, among others with the rest of the country.
The works were carried out by the Amazonas Zonal Unit, which consisted of the assembly and launch of the structures, the provision of accesses and conditioning of the concrete supports on both banks of the creek and the placement of road safety signs.
With these actions, Provías Nacional guarantees the land connectivity of the entire population, and as in this case, also improving safety conditions through the installation of the modular bridge.