📋 Tender Overview
The Safe Water Program for Lima and Callao (PASLC) of the Ministry of Housing, Construction and Sanitation (MVCS) is carrying out important water and sewage works in the marginal areas of Lot 07 and 10 of the district of Puente Piedra, with an investment valued at more than 37 million soles.
The project, which is being developed in lots 7 and 10 of the aforementioned district, has an investment cost of more than S/ 37 million and will benefit 2,338 residents in poverty and extreme poverty.
As part of the works, the installation of more than 16 km of pipes in secondary networks with 611 household drinking water connections is contemplated. Also, the installation of more than 12 km of pipes in secondary networks with 632 residential sewer connections.
"This project is significant because after 15 years the State is carrying out water and sewerage work in Puente Piedra," said the executive director of the Safe Water Program for Lima and Callao, Carlos Lozada Contreras.
In addition, 8 pressure reducing chambers, 4.7 km of adduction lines, and sewer mailboxes will be built and rehabilitated. Due to the geography of the place where the works are being carried out, seven retaining walls are also being built in order to preserve the safety of the networks in case of natural events.
It should be noted that the PASLC aims to implement drinking water and sewerage projects in Lima and Callao, which contribute to closing social gaps, providing access to these services in a safe, affordable and reliable way to sustain healthy livelihoods and maintain the dignity of people in vulnerable situations.