📋 Tender Overview
The Sierra Centro Sur Special Project Executing Unit of the Ministry of Agrarian Development and Irrigation headed by the Director of Agrarian Infrastructure and Irrigation Eng. Angel Prado Aquise together with the Zonal Director of Abancay Ing. Carlos Tito Del Solar Salazar, the supervisor Ing. Rigoberto Uscata Maldonado and the resident Ing. Tito Rodríguez, restarted with the execution of the I section of components 1 and 2 of the work "Creation of the Water Service in the System". of Antabamba Irrigation, district of Antabamba - province of Antabamba - department of Apurímac", which will benefit 3170 inhabitants of the communities of Chuñohuacho, Mollocco sector, Antabamba sector and Matará sector, which will irrigate 1310 hectares of land.
In this regard, the director of DIAR, Eng. Angel Prado Aquise, reported that it was restarted with section I of components 1 and 2 for the period 2024, which consists of the execution of:
-Component 1.1 Ccarampa intake, open and piped pipeline from km 0+000 to km 12+020 for a flow rate of 1,137 m3/sec.
-1.2 Sonccoyuma intake, piped pipeline from km 0+000 to 2+725 for a flow rate of 0+080 m3/sec.
-Likewise, with the second budget allocation 2024, the following component will begin:
-1.3 the construction of the twin siphon of 1825 ml length for a flow rate of 1,217 m3/sec of PVC-O pipe and cast iron.
Faced with this restart, the Deputy Mayor of the Antabamba Provincial Municipality, Esteban Cahuana Serrano, accompanied by the President of the Front for the Defense of Interests of Antabamba and the Committee of Irrigators, thanked the PESCS for this important work that has been advancing little by little until the construction of the 9 reservoirs in the three sections that will make a total of 51 km