📋 Tender Overview
After inspecting the expansion works of the Jorge Chávez International Airport, the Deputy Minister of Transport, Ismael Sutta, reported that the construction of the new passenger terminal is 47% complete.
This new infrastructure will have 5 floors, 3 breakwaters, 46 lounges for boarding and disembarking passengers and 12 remote lounges (for bus pick-up). In addition, it will have 47 sleeves (aircraft access gangway).
"With the expansion of the perimeter of the airport, it now has a dimension of 900 hectares. The airport will have the capacity to serve 30 million passengers per year. This will boost the economy and boost tourism in the country," said Sutta.
Currently, the equipment of the baggage system, fixed bridges that connect with the boarding strips, structures and finishes are being made in the common areas. Likewise, the terminal will have security cameras connected to a video surveillance system, where the route of users will be appreciated and will also have alarms to report incidents.
The expansion of the airport, which drives the current management of the Ministry of Transport and Communications led by Paola Lazarte, will serve approximately up to 30 million passengers per year. The terminal has a modern design, inspired by the Nazca culture, therefore, it has the shape of Hummingbird.
It will be the first air terminal in South America to have devices that isolate the seismic movement of the structure. It is expected that in 2025 it will start operating. The investment of the expansion is 2000 million dollars
This work is the result of the joint work between the MTC, through the Directorate of Programs and Projects in Transport, the Peruvian Corporation of Airports and Commercial Aviation (Corpac), the concessionaire Lima Airport Partners (LAP), the airlines and the aeronautical community in general.