📋 Tender Overview
The Ministry of Transport and Communications through Provas Nacional completed the installation of the Urakuza II modular bridge located at kilometer 44150 of the PE-5ND route of the Wawico - Santa Mara de Nieva section in the department of Amazonas.This new metallic structure replaces a permanent bridge that due to the heavy rains in the area and due to the increase in the flow in the Kayanza stream undermined the existing bridge structure and caused it to collapse.The works which were in charge of the Amazonas Zonal Unit consisted of the assembly of the structures the construction of the accesses at both ends of the ravine and the subsequent launching of the modular bridge. With the installation of this new modular bridge of 33528 meters in length the connection and passability in this sector is recovered in safer conditions and without restrictions on the road. In order to prevent interruptions to the road in the future the structure has been elevated with respect to the level of the previous bridge so that in the event of a possible activation of the ravine the structures of this new bridge are not damaged and trafficability is preserved.Likewise it facilitates trade and production to other local markets benefiting the population of the towns belonging to the district of Wawico and Santa Mara de Nieva in the province of Condorcanqui.From Provas Nacional we continue to attend to road emergencies in order to recover trafficability for the benefit of citizens.