Bridges and Tunnels

Peru Mtc Distribute Tender

📄 Tender ID: 493287777 📅 Published: 24 Aug 2023

📋 Tender Overview

To mitigate the possible damages that global El Niño and coastal El Nino could cause in our country, the Ministry of Transport and Communications (MTC), through Provías Nacional, has arranged the distribution of 43 bridges assembled in thirteen regions.

Given the heavy rains that will affect some regions of the country, the bridges will be installed in Ancash, Apurimac, Ayacucho, Cajamarca, Cusco, Huancavelica, Huánuco, Junín, Lambayeque, Lima, Piura, Tumbes and Puno.

The objective of the acquisition of modular metal bridge structures is to guarantee the passability and safety of the users of the National Road Network. There are 39 one-way bridges and 4 double-track bridges. Of these, three are 27.43 m long, 12 measure 45.72 m, 10 have a length of 54.86 m, 12 have an extension of 60.96 m and 6 measure 70.10 m.

The investment of this package of bridges amounts to S / 59 million. These infrastructures will save lives in the face of a natural disaster, help improve terrestrial intercommunication from one point to another and reduce travel times and transportation costs.

🔍 Key Information

📄
Tender Reference No.
493287777
📅
Publication Date
24 Aug 2023
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Peru

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 24 Aug 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Peru
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…