📋 Tender Overview
The modular structure is 18.2 metres long and replaces the old 4.5 metre track. The new Chinecas bridge is 18.2 meters long and replaces the old 4.5 meter road. The modular structure was completed by the Ministry of Transport and Communications (MTC), through its executing unit Provias Nacional. The road is located at kilometer 34 of the highway Empalme PE-1N (Santa) - Vinzos - Empalme PE-3N (Chuquicara) (route PE-12), in the district and province of Santa, department of Ancash.
This structure was installed to improve vehicular traffic in the sector over the Chinecas canal. The new double-lane bridge and pedestrian walkways replaces a single-lane structure, whose reduced width made traffic difficult and made the area prone to accidents.
This new bridge, built by the Ancash Zonal Unit of Provias Nacional, offers safe transportation conditions to residents of the provinces of Sihuas, Pomabamba, Corongo, Pallasca, Huaylas, Yungay, Carhuaz and Huaraz. It also connects the provinces of Santiago de Chuco and Pataz in the department of La Libertad; as well as the province of Maranon in Huanuco.
The road guarantees the transportation of local production to the surrounding towns and regional markets, which allows the continuity of the socio-economic activities of the region. Provias Nacional works on the non-concessioned national road network to optimize the conditions of the national highways, in favor of all Peruvians.