📋 Tender Overview
The Ministry of Transport and Communications completed the installation of a metal structure bridge to replace the old Calicanto bridge located on the creek of the same name at kilometer 101 of the Pasacancha-Pomabamba-Piscobamba-Huari section of the route that crosses the Callejn of Conchucos in the department of ncash. This new structure replaces a traditional bridge built more than 30 years ago that was no longer suitable for the passage of heavy-duty vehicles that circulate on the road and that was very narrow. With the installation of the new modular bridge which is 15 meters long the load capacity of this road is improved and traffic is optimized in safer conditions for people and vehicles. Likewise this infrastructure facilitates the trade of local production to other markets. The works which were in charge of the ncash Zonal Unit of Provas Nacional the executing body of the MTC consisted of the assembly of the structures the construction of the accesses on both banks of the ravine and the subsequent launch of the modular bridge. The MTC guarantees the terrestrial connectivity of the entire population and as in this case improves peoples safety conditions.