📋 Tender Overview
The Ministry of Transport and Communications through Provas Nacional completed the installation of the modular bridge at km 195 of the Los Libertadores road in the Suyacuna-Ayacucho Bridge section Huancavelica region. In this way the passage of vehicles that was interrupted by the collapse of the provisional access due to the increase in the flow of the Pampas River caused by the intense rains in the area is resumed. The installation works of the modular bridge were carried out in 11 days through the contractor Consorcio Puentes para el Per with the monitoring of the Ayacucho Zonal Unit and specialists from the Bridge Directorate of Provas Nacional. The metal structure is 51 meters long and guarantees traffic in the sector that interconnects the regions of Huancavelica and Ayacucho. The MTC through Provas Nacional reaffirms its commitment to continue with the attention of the road infrastructure to guarantee the transit of the entire population.