📋 Tender Overview
The Pan de Azucar sector of the province of La Convencion in Cusco has a new modular bridge. The Ministry of Transport and Communications MTC through Provas Nacional completed the installation of the metal structure on the Echarate-Kiteni national route in order to restore traffic in this area that was affected by a huaico last February. It should be noted that as a result of the intense rains in this area a huaico was generated at km 436 of the route in question which caused the interruption of traffic and the collapse of the Pan de Azcar bridge. For this reason at that time the immediate transfer of heavy machinery was ordered to attend to the road emergency. Work was carried out on the assembly of the structures of the 60-meter-long bridge which when put into service has allowed the reestablishment of vehicular circulation in the area.The works which were in charge of the Cusco Zonal Unit of Provas Nacional consisted of the assembly of the structures works in the riverine defense the construction of the accesses on both banks of the river and the subsequent launch of the modular bridge. Provas Nacional guarantees the land connectivity of the population of this region improving traffic through the installation of this metal bridge.