📋 Tender Overview
The Ministry of Transport and Communications through its executing unit Provas Nacional carries out the final installation works of a modular bridge in the Pan de Azcar sector in Cusco. The infrastructure is located at kilometer 436 of the Echarate-Kiteni national route province of La Convencion.The road about 60 meters long will allow vehicle traffic to be restored in the area. It should be noted that the previous bridge was destroyed by a large huaico in the second week of February which interrupted the passage of vehicles.Through the Zonal Unit of Cusco de Provas Nacional the affected sector was intervened. In addition to working on the installation of the modular bridge the provisional pass that was enabled has been kept passable.Given the intensity of the rains in the area it was decided to keep the heavy machinery and work crews in place permanently. Likewise the rubble rocks and materials dragged by the huaico were removed.Likewise riparian defenses were built on both banks of the riverbed and channeling work has been carried out in order to guarantee vehicular traffic through an enabled speed bump.According to the schedule the works to enable the modular bridge will conclude in the first half of May and thus the vehicle flow can be restored safely.