📋 Tender Overview
As part of a preventive work specialists from the Ministry of Transport and Communications MTC inspected the structures of the Los Angeles bridge which connects the districts of Chaclacayo and Lurigancho Chosica and the Ricardo Palma bridge located in the district of Santa Eulalia.The monitoring day was carried out considering the increase in rainfall in the mountains and east of the country that have activated the streams in the Lima region.The MTC through its executing unit Provas Nacional evaluated the possible risks of erosion in the bases and protective walls of the bridges as well as the conditions of the surface of the road structure.The Los Angeles 78 meters and Ricardo Palma 61 meters bridges are part of the Central Highway. The first is located in Metropolitan Lima and the second in the province of Huarochir.Preventive inspection is also important because according to Provas Nacional specialists 70 of the effects on bridges are related to hydrological and hydraulic causes that is the impact of water with infrastructure. Meanwhile 30 of damage to bridges has to do with factors such as the overload they support.