📋 Tender Overview
The Ministry of Transport and Communications MTC through Provas Nacional has been coordinating actions to recover passability on non-concessioned national roads affected by the rains. One of them is Route PE-02 A CanchaqueHuancabamba section in the province of Huancabamba in the Piura region. For your attention 9 machinery and work teams have been deployed in order to restore vehicular traffic that was affected in 5 sectors of the aforementioned Piurana highway. The objective is to restore the pass through the road in the shortest possible time. The affectations on this road are of great magnitude and are located between km 88 and km 126. Each damaged sector requires a particular treatment for its restoration a situation that is complicated by the continuity of heavy rainfall. The works began at km 88 in the sector called Puente Fierro with controlled cleaning of landslides and mudslides in order to recover the platform preventing the released material from being deposited in the basin of the ravine. With this material fillings will be made to raise the level of the road on the left bank and to install a modular bridge while on the right bank earthworks will be carried out with controlled earthworks in order not to deposit material in the channel. Alternate routesIt is important to note that alternative routes have been established for the transit of vehicles between the districts of Canchaque and Huancabamba. One of them begins in Huancabamba and continues through Dv. Curilcas to Morropn and the other is by the regional route Salitral-Los Ranchos-Huancabamba. The weather conditions in the area are adverse and the MTC is on permanent alert for the attention of road emergencies on non-concessioned national routes with priority being the work in those that interrupt or restrict traffic.