📋 Tender Overview
Thanks to the good disposition of Mayor Roy Saldana, the Provincial Municipality of Alto Amazonas, has been building the new culvert bridge of the A.H. La Campiña.
Before the start of the work, the provincial burgomaster visited and inspected the progress of the same. He spoke with the President, Mr. Joseph Tanchiva Onorbe, and pledged to deliver the new bridge as soon as possible.
The culvert bridge will be constructed with a corrugated metal pipe (TMC), cast steel and will be filled with reinforced concrete eaves. It will measure 5 meters long and 4 meters wide. It will improve the walkability of the more than 250 residents of the A.H. The Countryside and the Jungle of Don Teo.