📋 Tender Overview
The Provincial Municipality of Abancay (MPA) announces the start of an essential project that seeks to strengthen the water infrastructure in the province. With an initial budget of S/. 518,903.73 soles, aims to close the gaps in access to irrigation, directly benefiting hundreds of residents of the Peasant Community of Chupapata, who have faced the lack of an efficient irrigation system for more than two decades.
The project includes the construction of a hillside-type catchment with concrete FC=210 kg/cm2 and plastering with waterproofing, the installation of a 90 mm HDPE pipe conduction line with a length of 454.06 linear meters according to the NTP ISO 4427 standard, and the repair and improvement of a reservoir with a storage capacity of 90 m3, which includes the plastering of fissures, the construction of entry and exit chambers, and a perimeter fence. In addition, three concrete loading chambers FC=175 kg/cm2 will be built, pipes will be installed in the distribution lines and three control valve units will be installed.
These interventions will not only optimize the existing infrastructure, but will also significantly improve the efficiency of the use of water resources, allowing the irrigation of an agricultural area of 225 hectares that currently does not have access to irrigation.