📋 Tender Overview
Faced with the intense rains that have caused the increase in the flow of the Santa Eulalia River and the collapse of the Green Bridge leaving eight districts incommunicado a metal structure is installed in this part of the province of Huarochir.In response to the efforts of the regional governor Rosa Vsquez Cuadrado and the clamor of the population the Ministry of Transport and Communications in coordination with Provas Descentralizado enable the pedestrian pass only.After the visit in the place of the Deputy Minister of Transport Alberto ecco Tello the commitment was assumed to be available immediately another bridge of modular metal structure of 30.8 meters. A larger structure that restores pedestrian and vehicular traffic.However the first regional authority will be vigilant and insisting that at the end of the rainy season the MTC finishes with priority and in its entirety the rehabilitation work of the definitive bridge within the framework of the Reconstruction Law No. 30556.