📋 Tender Overview
With the purpose of reducing disease rates in rural families, the District Municipality of Salitral who represents the Sr. Elkin Jauregui Yong, met with the residents and leaders of the San Josede Hualcas Peasant Community, in order to publicize the beginnings of the maintenance and intervention to be carried out in the drinking water system. In this way, support for the Districts JASS is being encouraged so that they can provide a quality service, being one of the goals of the plan, for our district within commitment 4: Provision of quality Sanitation and sustainable services in the rural area.
The works to be carried out are: Construction of the El Cerezo spring catchment, construction of the El Cabuyo spring catchment, change of 2 concrete covers for 2 metal sanitary covers of 0.85 x 0.85 meters of the type 6 pressure breaker chamber, construction of the meeting chamber, installation of the reservoirs barbed wire perimeter fence, installation of a 1.50 reservoir, replacement of 500 meters of 2-inch diameter pipe with HDPE hose in an aerial pass and installation of 2 2-inch air valves in the conduction network.
Our commitment as municipal management is to be able to provide quality service to our entire population; The mayor expressed, for his part, lieutenant of said Community, he thanked and congratulated the initiative of the municipal authority. He is one of the first mayors who meets with us to be able to talk and listen to our concerns, we are very happy because this work is going to be carried out. in our village because in this way we can have good quality water for our children and the entire population.