📋 Tender Overview
Provías Nacional, the executing unit of the Ministry of Transport and Communications, culminated with the installation of the Caracucho modular bridge, strategically located on the PE-1NR highway called Andino Central.
The project, 42 meters long and double track, is key to strengthening infrastructure in Piura and ensuring road safety in the region.
In addition to facilitating the flow of vehicles, the bridge has pedestrian walkways, ensuring the integrity of the residents of the road, which integrates the districts of Santa Catalina de Mossa, Santo Domingo, Chalaco, Pacaypampa, in the provinces of Morropón and Ayabaca.
The installation works of the bridge were developed through the Piura Zonal Unit, and responds to the need for prevention in the face of the imminent rainy season and the activation of the Caracucho ravine.
Provías Nacional reiterates its commitment to development, through the implementation of road infrastructure that plays a crucial role in the prevention of possible impacts in the face of climatic events, such as the announced El Niño Phenomenon 2023 - 2024.