📋 Tender Overview
The rainy season in the 2016-2017 period produced landslides accompanied by strong floods causing the collapse of the pedestrian bridge in the Pilavira sector in the district of Ticaco Tarata. This affected and interrupted pedestrian traffic for both people and animals in the area. Given which the Regional Government of Tacna decided to intervene with the IOAAR project that renews the infrastructure of the suspension bridge which having completed its physical progress at 100 was inaugurated this morning by the regional governor Ing. Juan Tonconi Quispe. The first regional authority pointed out that the non-existence of a fixed structure represented a great danger for the integrity of the population. Likewise he highlighted that the inhabitants of Ticaco are mainly dedicated to agriculture livestock and the commercialization of products for which the construction of this infrastructure was essential. The beneficiary population amounts to more than 600 people who will improve their productive cultural and social activities. The investment for this work is 1.3 million soles. It was developed through indirect administration by the Pilavira consortium and included the renovation of the pedestrian bridge of 22.5 linear meters a width of 2.6 meters and 2.40 ml of free circulation for pedestrians. Similarly it has 2 concrete abutments and an intermediate pillar to support the metal superstructure.