📋 Tender Overview
The Huanuco Regional Government (Gorehco) is making progress in the reformulation of the technical file of the project Improvement and expansion of traffic services on the departmental road, route n.deg HU-114: Huancachupa Bridge - La Esperanza, in the districts of Pillco Marca and Amarilis, known as the Amazon Highway. This work seeks to alleviate congestion on the Central Highway and respond to the growth of the vehicle fleet in the department.
The Union Consortium, in charge of the reformulation, has completed important technical studies, including traffic, georeferencing, topography, geology, soils, hydrology and geometric road design. It also made progress in the release of properties, archaeological studies and impacts. These advances will be supervised and evaluated by the 4K Road Consortium, contracted to guarantee compliance with technical standards.
The project includes an 11.3-kilometer road with two lanes going and two returning lanes, each 3.60 meters wide, plus 3-meter shoulders. It also includes six vehicular bridges; Huallaga of 90 meters, Huancachupa of 25, Llicua of 15, Pumarino of 7, and two contingency bridges of 90 and 7 meters, respectively.
In addition, seven pedestrian bridges of 39 meters, 43 culverts, two retaining walls of 1,240 meters, 112 traffic signs, 156 traffic lights and the viaduct in the Ovalo Pavletich of 395 meters.
Governor Antonio Pulgar highlighted that this work will directly benefit 364,986 inhabitants of Huanuco, in addition to strategically connecting to the regions of San Martin and Ucayali. The file is prepared under strict technical and quality standards. This project will position Huanuco as a modern city with better connectivity, he said.
The Amazon Highway represents a decisive step towards the road and urban development of Huanuco, strengthening its regional integration and significantly improving the quality of life of its inhabitants.