📋 Tender Overview
Another great step towards the realization of change and development in Arequipa. The national government announced the launch of the international call for the comprehensive rehabilitation of the Majes - Siguas project and the construction of the dam in the intermediate basin. The invitation will be sent to at least 17 countries.
The regional governor of Arequipa, Rohel Sanchez Sanchez, welcomed the announcement of the launch that was made by the head of the Ministry of Agrarian Development and Irrigation, Angel Manero Campos, who reported that repairing the tunnels and canals of the first stage of the project, including the dam that will be used as a contingency, is necessary to continue with the conclusion of this great agricultural project.
The works carried out as part of the development of the major irrigation infrastructure will clear the way to continue with a second stage of Majes-Siguas or what has been called the comprehensive project, because in addition to the construction of the Condoroma dam, the development of the land, the transfer of water and others, the Majes City will also be included with all its services for some 300 thousand inhabitants.
This new stage will contemplate the extension of the agricultural frontier by 38,500 new hectares destined for the planting of products for export, generating more income for Arequipa. The minister also estimated that from 2027 and 2028 the auction of the land would begin.
The canals and tunnels that transport the water for the first stage of the agricultural project were built more than 40 years ago and damage has been detected in several sectors, so a comprehensive repair is necessary, since the water will also be transferred through there for a second stage. It was considered that more than 4 billion soles were needed, money that the Regional Government of Arequipa does not have, so it was decided to transfer the ownership of the project to MIDAGRI, which committed to assume the costs and thus its reactivation.
Currently there are more than 20 thousand hectares in production and a population of more than 180 thousand inhabitants, in addition to thousands of animals that are supplied with water. That is why while the infrastructure is being repaired, it is necessary to have the dam of the intermediate basin to continue supplying all of El Pedregal.
Minister Manero Campos at the time of making the announcement, said that Majes Siguas joins other irrigation projects underway such as Alto Piura (Piura), Chinecas (Ancash), the third stage of Chavimochic (La Libertad) and others, adding that there will be 238 thousand new hectares of crops that will contribute to increasing the agricultural surface of the country up to four times.
Governor Sanchez Sanchez, who has as one of the main axes of his administration at the head of the Regional Government of Arequipa, the present and future food security of the population, indicated that this is one more step towards achieving the desire of the people of Arequipa and that he will continue to make the necessary arrangements until it is completed.