📋 Tender Overview
With an investment of more than 21 million soles, the Piura Regional Government, through the Morropón Huancabamba Sub-Regional Management, completed the work of desilting and cleaning the riverbed and rocky dikes in the Charanal River, in the section from the town of San Pedro to Naranjito, in the district of Chulucanas.
The intervention of the works was carried out in a total of 2.4 kilometers, where the desilting and cleaning was carried out with a width of 30 meters, while the protection with rock of the left bank with the formation of a longitudinal dike took place in a total of 1750 meters.
In view of this, following the official procedures at the end of the execution of a work, the Morropón Huancabamba Sub-Regional Management will proceed to form the reception committee that will be in charge of verifying and evaluating in detail the works completed in this work.
The subregional manager Walter Huancas Chinchay stressed that this work protects the urban population of the town of San Pedro, crop fields and access roads from possible flooding during the rainy season, since the Charanal River increases its flow considerably.
"The regional government, led by Governor Luis Neyra León, has been working on this type of project that contributes to safeguarding the population, cultivation areas and infrastructure," he concluded.