Roads and Highways Roadways

Peru Concessioned Roads Tender

📄 Tender ID: 484188456 📅 Published: 07 Feb 2023

📋 Tender Overview

The Supervisory Agency for Investment in Transport Infrastructure for Public Use Ositrn reported that at the end of 2022 the concessioned roads registered an advance of 87 in kilometers km built with respect to the total of 2486 km committed for construction. And 99.5 of the intervened km of a total of 4077 km committed was reached.Thus the Regulator supervised the construction of 2163 km and the commissioning of more than 4056.5 km.It should be noted that the report of kilometers built considers the roads delivered to guarantee the passability of users and the continued development of economic activities. On these roads the Ositrn also supervises that the service levels are optimal.Of the 16 roads concessioned under the Ositran area 8 reached 100 of kilometers built and intervened that is roads were built from scratch and commissioning and maintenance works were executed.Such is the case of the IIRSA Norte highway Paita-Yurimaguas where 200.7 km were built and 806.4 km were intervened tuning and initial maintenance registering an advance of 100 of the total committed 1007.1 km higher than the 955.1 km stipulated in the concession contract.In Road Network No. 5 Ancn-Huacho-Pativilca road section 91.2 km of roads were built and 91.5 km were intervened which meant an advance of 100 of the total of 182.7 km committed.Likewise Road Network No. 6 Pucusana-Cerro Azul-Ica registered the construction of 215.2 km of roads and 279.3 km intervened equivalent to an advance of 100 of the total of 494.5 km committed greater than the 221.7 km established in its contract.By 2022 investments are still being developed in four roads that register a lower percentage of progress in kilometers built. These are Road Network No. 4 Pativilca-Puerto Salaverry which reports 265 km of road construction which represents 74.4 progress compared to the 356.2 km committed.While the Autopista del Sol registered 57.1 progress with the construction of 150.1 km of road out of a total of 262.7 km. The km built correspond to the works of the Piura-Sullana subsection.On the Longitudinal de la Sierra-Tramo 2 road the progress is 58.8 in built km and 95.8 in intervened km. At the end of last year the construction of 53 km was reported.This road comprises a total of 874.1 km of which 90.1 km will be built and 460.56 km intervened with Initial Periodic Maintenance.The Dv Quilca-La Concordia road section is 13.5 complete in km built. By 2022 10.1 km of 428.6 km committed for construction were built. The works are delayed by the lack of delivery of land.On other roads Ositrn only supervises the kilometers intervened as in IIRSA South Section 1 and IIRSA Center Section 2.The OsitranThe accumulated investment in roads amounted to USD 4818.3 million at the end of 2022 equivalent to 96.17 of its investment commitments.

🔍 Key Information

📄
Tender Reference No.
484188456
📅
Publication Date
07 Feb 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Peru

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 07 Feb 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Peru
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…