The Comptroller Generals Office warned of risks in the execution of irrigation work in the town center of Piscaya in charge of the District Municipality of Pichirhua. Items that were not executed and partially executed were noted, without considering the plans of the approved technical file and with construction deficiencies in the intake, sand trap, lateral intakes and reservoir that put the fulfillment of the project objectives at risk. The Control Visit Report No. 015-2024-OCI/0347-SVC, issued by the Institutional Control Body (OCI) of the Provincial Municipality of Abancay, specified that the district municipality through mayoral resolution of May 15, 2023 approved the technical file of the work Creation of the water provision service for irrigation in Piscaya of the town center of Piscaya, district of Pichirhua, province of Abancay by the direct administration modality, with a total budget of S/ 686,542, which considers the construction of an intake, sand trap, irrigation canals and reservoir to increase agricultural productivity.

Technical deficiencies were verified in the measurements of the intake walls in the Ccanccantuy and Piscaya sectors that were not in accordance with the technical file, which denotes reductions in the structures. Regarding the sand trap in the Ccanccantuy sector, the structure is unfinished and with different dimensions than the plans in the technical file, there is a lack of transition pool and drainage channel in the ravine. In the Piscaya sector reservoir, cracks and fissures were identified in a wall, as well as crab holes or porosities, among other observations that put its future integrity at risk due to the hydraulic pressures it supports.

Likewise, the lack of authorization from the National Water Authority (ANA) for the execution of water use works aimed at obtaining water use rights was identified, as established in article 62 of the Water Resources Law No. deg 29338 and article 89 of its regulations, which puts the continuity of the project at risk. Also, the precarious construction warehouse was found to be at risk of collapse and loss of stored material, and the lack of someone responsible for its management and custody. Likewise, the lack of visible control registration cards in the construction warehouse puts the registration and control of entry and exit of materials at risk. In addition to inadequate storage of materials such as cement, wood, corrugated steel, PVC pipes and wire. At the time of the control visit, the work had been paralyzed and abandoned since October 2023.

The control report was communicated to the head of the entity so that he could adopt the corresponding corrective and preventive actions to ensure the continuity of the process and the result or achievement of the objectives of the work. The report is published in the Control Services Report Search.

🔍 Key Information

📄
Tender Reference No.
504573696
📅
Publication Date
06 Jun 2024
🌐
Sector
Water and Sanitation
📝
Notice Type
News
📍
Location
Peru

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 06 Jun 2024
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Peru
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…