📋 Tender Overview
The General Comptrollers Office warned of deficiencies in the execution of the balance and complementary works of the improvement work on the Yanahuanca - Cerro de Pasco highway, which generates the risk of affecting the transitability, quality and durability of this project valued at more than S/ 13.8 million and which is in charge of the Regional Government of Pasco.
According to the Control Visit Report Ndeg047-2024-OCI/5348-SVC, during the physical inspection of the work, superficial and structural deficiencies were noted along the route such as potholes, fissures, cracks, deterioration in the asphalt layer and obstruction of the gutters. This would be due to the fact that only superficial treatments would be considered, without knowing the real diagnosis of the road, which would be corroborated by the structural deficiencies presented in areas that have already been corrected.
In addition, the lack of road signs such as reflective studs, pavement markings, metal guardrails and painted mileage posts was noted, which generates the risk of affecting the safety and integrity of transporters and users who travel on the road.
Another fact observed was that one of the professionals proposed by the contractor (laboratory manager) is not licensed to practice his profession, which generates the risk of affecting the validity and legality of the documents he signs. Finally, it was noted that the entity does not keep the progress of the work updated in the Infobras system. This would affect the transparency of management, the proper exercise of social control, supervision and monitoring of public works. The control report is published on the institutional web portal of the Comptrollers Office www.gob.pe/contraloria, which is accessible to the public.