📋 Tender Overview
The Comptroller General detected several deficiencies in the execution of the work of sports and recreational services in the peasant community of Apabuco, located in the district of Sandia, which are mainly related to the synthetic grass sports field and the country restaurant, which could compromise the quality of the construction and the useful life of the complex.
The work, which has a budget of S / 2 700 366, would benefit more than 3 thousand inhabitants, and includes the construction of multipurpose sports infrastructure, including a synthetic grass sports field, stands for the spectator public, country restaurant, spaces for social events and others.
According to the Control Visit Report No. 015-2023-OCI/0464-SVC, the control commission found that the material used as a granular base of the sports field does not comply with the technical specifications established in the approved technical file.
In addition, cracks were observed in the perimeter sidewalks, as well as the presence of crabeaters (area with voids) in the columns of the country restaurant component, which affects the structural quality of the building.
It was also identified that the personnel in charge of the warehouse allows the removal of material without keeping an adequate record of the name and signature in the material control format. This situation represents a significant risk, since it could compromise the adequate control of the output of inputs and materials destined for the work.
Another relevant aspect is the absence of the work supervisor, which could generate poor technical control during the execution of the different items that comprise the project, putting at risk the fulfillment of the established goals. In addition, the lack of the workbook during the execution of the works could limit the control and monitoring of incidents, affecting decision-making and the transparency of records in the execution of the work.
The Comptroller's report, whose evaluated period runs from June 26 to July 12, 2023, was communicated to the mayor of the Provincial Municipality of Sandia so that the corresponding corrective actions can be taken and thus guarantee compliance with the objectives of the work. Citizens have the possibility to access the results of this and other reports through the Control Report Finder and the https://www.gob.pe/contraloria portal.