📋 Tender Overview
The National Water Authority (ANA) reported that cleaning and desilting work has begun on both banks of the Chancay-Huaral River, in the Lima region, in a 1.22-kilometer stretch of riverbed.
The purpose of these activities is to prevent overflows and floods due to the rise of rivers due to the possible presence of the El Niño phenomenon.
According to the emergency technical sheet prepared by the ANA, these works will last approximately 20 days, and will protect 66 families; in addition to 83 hectares under irrigation, in which vegetable production predominates.
In the same way, it will preserve the Boza Baja intake, 1.8 km of the diversion channel and its lateral channels operated by the Board of Users of the Chancay-Huaral Hydraulic Sector.
This intervention is the result of coordination between the National Water Authority (ANA), the Board of Users of the Chancay-Huaral Hydraulic Sector (JUSHCHH) and the National Society of Mining, Petroleum and Energy (SNMPE). Support from the private sector includes the provision of heavy machinery for preventive work.