📋 Tender Overview
The installation of the bridge was completed, restoring traffic in the area. The Ministry of Transport and Communications (MTC), through its executing unit Provias Nacional, puts the Churuyacu modular bridge, located in the province of San Ignacio, Cajamarca region, into service for the population, reestablishing the connection in the sector.
The new infrastructure is 33.52 meters long, is located at km 90 of the Tamborapa - Curuyacu section, and was installed due to the erosion and undermining of the bridge supports due to the increase in the flow of the Tabaconas River.
This route is served by a maintenance contractor company who was in charge of the installation work of the modular bridge within the scheduled deadlines. Likewise, work continues on the profiling of the lateral slope, building a protective wall to reinforce and protect this section of the bridge.
The installation of this modular bridge enables the transfer of road users as well as residents of the area, most of whom are dedicated to livestock farming, directly benefiting the population of the districts of Sondor, Cruz Chiquita, Tabaconas, Tamborapa Pueblo, San Jose del Alto, Tamborapa and Ambato.
We maintain our commitment to preserve the connection between towns and guarantee safe vehicular traffic for the benefit of citizens.