📋 Tender Overview
The Ministry of Transportation and Communications (MTC), through Provias Nacional, completed the installation of the Cachinani modular bridge, located at km 17 of the Emp route. PE-3SG - Vilavila - Palca - Lampa - Juliaca, province of Lampa, department of Puno. The Cachinani modular bridge is 27.4 meters long and connects the districts of Palca and Lampa. As recalled, this new infrastructure was placed due to the undermining of the structures of the bridge that was located in that sector, caused by the heavy rains in the area, which activated the ravine, damaging the structures of said bridge.
Thus, after the evaluation by bridge specialist engineers, the installation of a new modular bridge was managed in order to recover trafficability in the Rivera Coylata sector. The bridge installation work was carried out by the Bridges Directorate and the Arequipa Zonal Unit. The work carried out consisted of the demolition of the collapsed bridge, the placement of supports, the assembly and launch of the modular bridge.
This bridge is already at the service of the citizens of the surrounding towns and the users of this route. The installation of this modular bridge makes it possible to transport the residents of the area, most of whom are dedicated to livestock and agriculture. This guarantees the fluidity of vehicular traffic and the connection through this route.