📋 Tender Overview
After a meeting held on the morning of Wednesday, April 24, the population of the Tablurán hamlet in coordination with the district and regional authorities has managed to build an alternative exit road to the new road that is being built in the mountain range of the hamlet belonging to the District of Huarmaca.
The meeting was attended by the mayor of the district of Huarmaca, Vicente Tiquillahuanca Chuquipoma, together with the councilors of the Huarmaquina commune, the mayor of the district of San Miguel del Faique, the mayor of the district of Sondorillo, officials of the Directorate of Infrastructure of the Morropón Huancabamba Sub-Region, the Mayor of the CP. Valle Nor Pacífico Tunas, Lieutenant Governors, Rondas Campesinas, population of the sector and surrounding hamlets, and allowed reaching agreements such as the construction of the alternate road that will link from the Portachuelo – Tablurán – Exit Portal sector to the Alto Piura project to Camarurán, at the request of the population as a result of the works that are being carried out with the construction of the highway that will connect Huancabamba – Sondorillo and San Miguel del Faique through the mountain range of the district of Huarmaca, a work carried out by the Morropón Huancabamba Sub-Region.
For his part, the mayor of the district of San Miguel del Faique, promised to donate 10,000 seedlings of various species to reforest the different areas of the hamlet as a way to mitigate the damage to vegetation generated during the construction process of the road.
Meanwhile, the technical team of the Sub-Region said that within 30 days they will be carrying out the topographic studies and then proceed to the construction of the alternate road for the benefit of the population of Tablurán.
In his speech, the Huarmaquina Municipal Authority promised to carry out the pertinent procedures with the competent entities to carry out the relocation of the population due to the subsidence of land due to geological faults in the hamlet.
Background: The construction of the highway that will connect Huancabamba – Sondorillo and San Miguel del Faique is a project of the District Municipality of San Miguel del Faique and is being executed by the Sub-Region through contractor companies. This road crosses through the hamlet of Tablurán and is in accordance with the manifestos of the population from previous meetings, where they expressed to the authorities their discomfort at the damage caused to the fauna and flora (millenary trees). They demanded that the authorities and the company executing the work comply with the agreements embodied in the minutes such as the location of the DME (deposit of surplus material), protection of nature through reforestation and the construction of an alternative road for the population of the sector. This last request of the population is also due to the geological faults that have generated the subsidence of land in various points of the hamlet, causing large cracks in homes and the educational institution itself, which puts the more than 170 inhabitants at latent risk in the face of a disaster.