📋 Tender Overview
In the city of San Ignacio, Misiones department, important works are being carried out to improve road safety for the population, under the responsibility of the Ministry of Public Works and Communications (MOPC). This project is part of the initiative to Enable the Paved Network Transport Connectivity, financed by the World Bank (WB). The works are focusing on the construction of safe school corridors on Iturbe and Capitan del Puerto streets, which has led to these roads being temporarily closed to traffic. Also, work is being done on preventive horizontal and vertical signage in the area to alert drivers about their proximity to these areas. In addition, bollards were installed to delimit pedestrian spaces, as well as improvements in the lighting of strategic sectors. At the same time, street crossings were raised to the level of sidewalks and curbs, creating uneven surfaces to force vehicles to reduce speed. Additionally, vehicle control measures are implemented to calm traffic in the busiest urban areas.
An impact beyond the works This effort not only aims to improve the road infrastructure of San Ignacio, but also contributes to the socioeconomic development of the municipality, facilitating safe and efficient access for all citizens. Additionally, vehicle control measures are implemented to calm traffic in the busiest urban areas. The Feldman company is in charge of the works, with an execution period of 12 months, following strict quality and safety standards. Supervision is in charge of the inspection company SPDYD. In addition, the National Agency for Traffic and Road Safety (ANTSV) actively collaborates in this undertaking with training and road education sessions aimed at the community. The MOPC pilot plan covers five municipalities: San Ignacio and Coronel Bogado in the south, and Capiibary, San Estanislao and Carayao in the north, in a coordinated effort with the respective municipalities.