📋 Tender Overview
In Lot 2 of the enabling and maintenance works of the PY09 Transchaco route the asphalt paving works of the bridge located over the He stream have already been completed.For said task 800 tons of asphalt concrete with polymer and rolling folder were used. All this on the slab of the board of the structure which has 90 linear meters and is located at the height of km 116.5 of the Transchaco.With this production it is possible to connect the intervened tracks thus reaching 44.5 km of continuous rolling course from km 112 to km 156.5. The works of this lot are in charge of the Route 9 Transchaco Consortium integrated by Benito Roggio and Hijos SA and LT. SA The interventions range from km 112 to kmLikewise in the remainder of the month of September it is planned to execute 15000 tons of asphalt mixture as well as the black base lower layer of asphalt concrete and the rolling layer polymer-modified asphalt concrete in the section that its up to the LT firm which is also responsible for the part of the bridge.