📋 Tender Overview
In the department of eembuc the construction of the concrete bridge over the Paso P stream is advancing. It has 75 execution and is one of the largest in the entire department. The bridge is part of the asphalt paving work on the Alberdi detour section and the Tebicuary river lot 1.Of the 24 slabs 14 are already loaded with concrete. The work in general has an advance of 85 and is a source of employment for 400 people. It covers 51.56 kilometers which also includes the improvement of the urban crossing of Villa Franca which adds some 2.05 km more to the work. The works are in charge of the TC Pilar Consortium.