📋 Tender Overview
The rehabilitation and duplication works of 19.20 km corresponding to the section Remanso Route PY09 Vista Alegre Puerto Jos Falcn in the department of Presidente Hayes contemplate the construction of three reinforced concrete bridges whose execution reached 88 in average.These new structures are 15 20 and 60 meters long the first with 100 progress the second with 80 progress and the last one registering 85 progress which yields a general average of 88 in this item.With respect to the 20-meter bridge the tiles have already been installed and the deck slab is now in the process of being assembled work scheduled for next week. Meanwhile on the 60-meter walkway the loading of the deck slab corresponding to the main span has already been completed now it will proceed to its loading while the third span is still in the process of assembling tiles hoping to carry out the corresponding loading next week.The improvement of the road section covers 19.20 kilometers of which 9 already have asphalt pavement including 4.6 kilometers that are fully signposted.The execution of this project will strengthen regional integration specifically with Argentina through the construction of the Hroes del Chaco Bridge which will connect for the first time Asuncin with the Western Region.The works are in charge of the Puerto Falcn Consortium made up of the construction companies Benito Roggio e Hijos SA and LTSA for an amount of G. 158351995484.