📋 Tender Overview
One of the works contemplated in Section 1 of the Desvo Alberdi Pilar route is the construction of a 625-meter-long bridge over the Paso Pe stream which will put an end to the transit problems that occur in times of flooding.The new walkway under construction - which will be 10.54 meters wide - is located between stations 10020 and 10645 of the section that includes this work a total of 53 km in charge of the TC Pilar Consortium with a G contract 372.700.692.346.It is a place where the waters frequently gain ground and cut the route in times of flooding photos from 2019. This will not happen again when the bridge is finished which is in the initial stage of construction. Currently the first stretch of this departmental route spanning from the Tebicuary River to the turnoff to the town of Alberdi has about 55 of accumulated progress.The tasks carried out in this lot consist mainly of soil movement to raise the conventional embankment and by means of refilling spreading of the improved subgrade with the incorporation of lime subbase stabilized granular base and primer irrigation. It accompanies the installation of cellular sewers along the route. All the items mentioned above are developed from km 0 Alberdi bypass to km 39. That is the first 35 km of the 51.56 km provided for in the contract for Section 1 which also includes the improvement of the crossing of Villa Franca with which 2.05 km more are added.This is a key work because it will connect with the second section that has already been fully completed up to Pilar thus forming a 90 km circulation corridor. The commissioning of the renovated road in its entire extent will benefit 85000 inhabitants of the municipalities of Villa Franca Mburica San Juan Bautista del eembuc Tacuara and Pilar.