📋 Tender Overview
The official commercial operation of the Savan 1 Wind Power Plant on December 26 not only marks a new step forward for T&T Group in the field of renewable energy, but also contributes to realizing the goal of increasing the scale of electricity imports from Laos according to the Agreement between the two Governments. Download Savan 1 Wind Power Plant has been in commercial operation in the last days of 2025. According to the latest information from T&T Group, on December 26, 48 wind turbines of Savan 1 Wind Power Plant - a renewable energy project invested and developed by T&T Group in Laos - were officially put into commercial operation, bringing clean electricity to Vietnam. Total capacity reaches 300 MW. Located in Savannakhet province, Lao PDR, Savan 1 wind power plant is the largest onshore wind power project that T&T Group has invested in to date; marks this Groups first step in its cross-border energy strategy. With a total installed capacity of up to 495 MW and a total investment of about 768 million USD, the Savan 1 wind power plant is expected to become one of the typical renewable energy projects in energy cooperation between Vietnam and Laos. The project was awarded a concession contract by the Lao Ministry of Planning and Investment to T&T Group from January 2025. According to this contract, the Government of the Lao PDR agreed to let Savan 1 Wind Power Company Limited (a member of T&T Group) design, build, own and operate the project for a period of 25 years to export and sell electricity to Vietnam. According to the plan, phase 1 of the project has an installed capacity of 300 MW, with a total investment capital of more than 490 million USD. Previously, in August 2024, the Prime Minister approved the policy of importing electricity from the Savan 1 wind power plant project to Vietnam. The power purchase contract for Savan 1 Wind Power Project between Savan 1 Wind Power Company Limited and Vietnam Electricity Group (EVN) has also been officially signed, creating a legal basis for electricity from the project to be included in Vietnams electricity system. Savan 1 Wind Power Company Limited has also signed a capital arrangement agreement for the project with MB Bank. According to this agreement, MB Bank is the lead bank committed to successfully arranging and allocating the entire financing package for the investor to implement phase 1. In addition, the general contractor for the project is the joint venture contractor IPC E&C-GEDI. Immediately after receiving the concession contract, T&T Group urgently built a 220 kV transmission line more than 50 km long from the factory to the waiting pole on the Vietnamese side. The transmission line will be completed at the end of August 2025, creating a lifeline to bring clean electricity to the country. In parallel, T&T Group also promotes the construction and completion of the Savan 1 plant with the strong determination to reach the goal of commercial operation at the end of 2025. Download The official commercial operation of the Savan 1 wind power plant is an important milestone, marking T&T Groups steady steps in the field of energy investment. clean cross-border. According to T&T Group representative, the official commercial operation of Savan 1 Wind Power Plant on December 26 is an important milestone, marking T&T Groups steady steps in the field of cross-border clean energy investment. At the same time, this is also a testament to T&T Groups capacity and commitment to strengthening national energy security, gradually expanding the economic development space, and enhancing strong bilateral cooperation between Vietnam and Laos. The official commercial operation of Savan 1 Wind Power Plant is an important milestone, creating a foundation for T&T Group to continue researching and implementing cross-border clean energy projects in a sustainable and effective manner in the next period Step by step realize the goal of making T&T Group become the leading energy developer in Vietnam, a representative of T&T Group emphasized. Over the past many years, cooperation in the field of energy, especially electricity, between Vietnam and Laos has been promoted; The two countries have strengthened cooperation agreements to implement many investment projects and energy cooperation activities, with a focus on the Coal-Power Purchase Agreement between the Governments of the two countries to promote infrastructure connection, develop energy projects and increase electricity exchange. Against that background, the implementation and commercial operation of the Savan 1 Wind Power Plant shows that bilateral cooperation agreements and agreements are gradually being concretized with effective and sustainable projects. From a broader perspective, the project also reflects the increasingly clear role of the private economic sector in participating in implementing cross-border energy projects, contributing to supplementing electricity supply, enhancing infrastructure connections and promoting economic cooperation between Vietnam and Laos in the context of energy transition and sustainable development, which is becoming a common trend in the region. Minh Ngoc Read more T&T Group was honored at the Thang Long Entrepreneurs and Enterprises Honoring Ceremony 2025See moreT&T Groups desire for the sky and visionSee moreFC National Assembly delegates friendly with FC T&T Group, donating more than 1 billion VND to support people in flooded areasSee moreT&T Homes officially launched the first Sales Gallery in Ho Chi Minh CityReferencemoreT&T Group signed a strategic cooperation with the Vietnam Young Entrepreneurs AssociationSee moreT&T Group proposes to invest in many strategic projects in Khanh Hoa provinceSee moreSHB and T&T Group accompany to bring Vietnamese culture to the worldSee moreT&T Groups AI application, SuperPort(tm) makes an impression at VIIE 2025