📋 Tender Overview
Part of the Arequipa - La Joya highway projectThe start of paving on the La Nueva Molina road, part of the Arequipa - La Joya highway project, marks an important advance in this work of the Regional Government of Arequipa to decongest traffic entering and leaving Arequipa.
With a physical progress of 34% in its total 5.8 kilometers, 800 linear meters of priming have already been completed, starting the final paving.
The site manager, Eng. Reyna Salinas, reported that work is being done simultaneously on different fronts to prepare the base of the terrain, pave and reinforce the uneven areas, guaranteeing the safety and durability of the road.
In the most challenging sections, between kilometers 3 and 4, drilling equipment is being used to carry out controlled blasting and remove materials, ensuring the stability of the terrain. This effort includes the construction of retaining walls and the filling of low areas with suitable materials, essential for the conditions of the area.
The La Nueva Molina highway is emerging as a strategic project for the regions connectivity, offering a direct exit to the Panamericana Sur and relieving congestion in the Northern Cone. This highway will significantly reduce travel times and transportation costs, boosting the economic development of Arequipa and improving the quality of life of more than one million people in Arequipa and neighboring regions such as Puno and Cusco.
The total investment of 32 million 396 thousand 327.27 soles will not only connect Arequipa with new business opportunities, but is also generating direct employment for 112 workers, distributed across four work fronts.