Banking, Finance, Insurance and Securities (BFIS) Consultancy - Financial Renewable Energy

Norway Statfjord Home Tender

📄 Tender ID: 444002945 📅 Published: 07 May 2019

📋 Tender Overview

The Statfjord A platform in the North Sea will shut down production in 2022 43 years after first oil. This more than doubles the expected lifetime of the platform. Now the contract for removal and disposal of the topside has been signed and the topside will be demolished at Stord where it was built in the 1970s.The contract for the engineering work preparations removal and disposal of the topside has been awarded to Excalibur Marine Contractors a company in the Allseas group. Kvrner AS at Stord has been hired by Excalibur to dismantle and recycle the topside onshore.The 48000-tonne topside structure will be removed from the concrete legs in one single lift by the Allseas vessel the Pioneering SpiritThe vessel has never performed a lift this heavy. It currently has a lifting capacity of 48000 tonnes equal to the weight of the Statfjord A topside structure. The capacity will be increased prior to the lifting operation.One of the oldest platforms on the Norwegian continental shelf Statfjord A was originally scheduled to be shut down in 1999. It has since then undergone substantial upgrading and the platform life has been extended several times.Since first oil on 24 November 1979 the Statfjord field has produced more than five billion barrels of oil and gas generating more than NOK 1 500 billion in revenues.Statfjord A has meant so much to many people. The platform has generated enormous values many jobs and a proud history. Shutting down production and removing the installation is part of a platforms life cycle and we will make sure that this is done in a safe manner while taking care of personnel and capabilities in a late life phase says Hege Flatheim vice president for Statfjord operations.The article continues below the photosPortraits of Peggy Krantz-Underland left Hege Flatheim and Thomas Bjrn ThommesenPeggy Krantz-Underland left Equinors chief procurement officer Hege Flatheim vice president for Statfjord operations and Thomas Bjrn Thommesen Equinors project director for decommissioning projects.All environmental aspects of the decommissioning will be handled in accordance with the highest industry standard and with a recycling grade as high as possible.The two other platforms on the field Statfjord B from 1982 and Statfjord C from 1985 will remain on stream until 2025 at least.The impact assessment for the Statfjord A removal was issued for public consultation in the autumn of 2018 and preparations for shutdown and decommissioning have long been underway. The next step now is to submit the disposal part of the decommissioning plan to the authorities.It will describe the proposed disposal solution and timing of the final shutdown of production for Statfjord A. We also plan to start permanent plugging of wells on Statfjord A this year using the platforms drilling facilities says Thomas Bjrn Thommesen Equinors project director for decommissioning projects.

🔍 Key Information

📄
Tender Reference No.
444002945
📅
Publication Date
07 May 2019
🌐
Sector
Banking, Finance, Insurance and Securities (BFIS)
📝
Notice Type
News
📍
Location
Norway

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 07 May 2019
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Norway
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…