Transportation

North South Expressway Tender

📄 Tender ID: 536054697 📅 Published: 06 Aug 2026

📋 Tender Overview

The Department of Construction Investment Management Economics (Ministry of Construction) has just sent a document to the Ministry of Construction reporting on reviewing and overcoming shortcomings of the toll collection system at 5 public investment component projects of the Eastern North-South Expressway Project in the period 2017-2020 and the Back-End expressway toll collection system of the Van Phong - Nha Trang Expressway project. Download The smart traffic system, non-stop toll collection and vehicle load control system have revealed some existing content. The Department of Economics - Construction Investment Management said that the toll collection system at 5 public investment component projects of the North - South Eastern Expressway in the period 2017 - 2020 includes Mai Son - National Highway 45, National Highway 45 - Nghi Son, Nghi Son - Dien Chau, Vinh Hao - Phan Thiet and Phan Thiet - Dau Seconds is implemented on the basis of ITS design documents and non-stop electronic toll collection (ETC) prepared by Project Management Board 6 (now the Railway Project Management Board), and the Department of Economics - Construction Investment Management presides over the appraisal. During the implementation process, 5 PPP projects were converted to public investment so the ITS and ETC systems have not been deployed immediately, while the remaining 3 PPP projects have been completed and operating toll collection since May 2024, especially the section. Dien Chau - Bai Vot from January 2025. These systems operate stably. In September 2024, the Ministry of Transport (now the Ministry of Construction) approved project adjustments to add a vehicle load control system and complete ITS and ETC at 5 public investment projects. After completing the investment, the Vietnam Road Department will receive and organize toll collection from the beginning of March 2026. The Back-End system of the Van Phong - Nha Trang project was also completed, connecting data with 5 projects to serve toll collection. However, according to a report from the Vietnam Road Administration, after the operation period, the ITS, ETC and load control systems at the 5 projects revealed many shortcomings. Despite being asked to fix and improve, the results of two evaluations showed that the operating performance index (KPI) still did not meet the requirements. The main reason is that the arrangement of some equipment at the toll station is not suitable for the interline closed toll collection model, along with the incomplete toll collection software at the station and the Back-End system. These are all specialized information technology issues that need to be examined and evaluated to determine the causes and solutions, instead of letting investors handle them themselves. It is necessary to assign an agency specializing in information technology to inspect and evaluate. To quickly completely overcome the shortcomings of the toll collection system in 5 public investment component projects of the Eastern North-South Expressway Project for the period 2017-2020, the Department of Economics - Construction Investment Management proposed that the Ministry of Construction assign the Information Technology Center to preside over and coordinate with relevant units to inspect all toll stations of 5 projects and the Back-End system of Van Phong - Nha Trang project, identify causes, propose solutions and direct remediation. Project Management Boards 2, 7, Thang Long, and Railways are responsible for providing all relevant records and documents; Direct contractors and consulting units to coordinate with specialized agencies and units under the Ministry of Construction in the process of inspection and review. Project management boards direct construction contractors and consulting units to overcome shortcomings in the toll collection system at 5 public investment component projects of the Eastern North-South Expressway Project for the period 2017-2020 and the Back-End system, ensuring that technical requirements and KPI indicators are met. according to regulations, completed before August 15. Phan Trang See more Urgently complete the rest stops, introduce toll collection on the entire North-South expressway from August 15 See more First day of automatic toll collection through 5 sections of the North - South expressway: Fast circulation See more Accelerate the implementation of toll collection on eligible expressways See more Prepare to collect additional tolls on some eastern North-South expressway sections from today July 15

🔍 Key Information

📄
Tender Reference No.
536054697
📅
Publication Date
06 Aug 2026
🌐
Sector
Transportation
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 06 Aug 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…